Dismantling of a secondary shaft. Nissan Almera (from 1995 to 1999 of release)
Nissan Almera service from 1995 to 2000 in N15 body
1. General information
2. The general requirements to car repairs
3. Operation and car maintenance
4. Petrol engines
5. Diesel engines
6. Transmission
6.1. Coupling
6.2. Mechanical transmission
6.2.1. General information
6.2.2. Removal and transmission installation
6.2.3. Transmission dismantling
6.2.4. Dismantling of primary shaft
6.2.5. Assembly of primary shaft
6.2.6. Dismantling of a secondary shaft
6.2.7. Assembly secondary валаф
6.2.8. Dismantling and differential assembly
6.2.9. Transmission assembly
6.3. Automatic transmission
6.4. Drive of forward wheels
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Electric equipment schemes
 







993f9bf4 993f9bf4 993f9bf4

6-2-6-razborka-vtorichnogo-vala.html

6.2.6. Dismantling of a secondary shaft


Fig. 4.23. Check of an axial gap of a gear wheel


Check a condition of gear wheels and measure axial gaps of each gear wheel (fig. 4.23). If values of gaps fall outside the limits, specified in tab. 4.2, replace all details of a secondary shaft.

Fig. 4.24. Removal of an internal ring of the bearing and basic half rings: 1 — an internal ring; 2 — basic half rings


Fig. 4.25. Removal of a gear wheel of the V transfer


Fig. 4.26. Removal of the blocking plug


Fig. 4.27. Extraction of a ball of a clamp


Fig. 4.28. Removal of a gear wheel of the III transfer


Fig. 4.29. Removal of the blocking plug


Fig. 4.30. Removal of a gear wheel of the II transfer


Fig. 4.31. Extraction of a ball of a clamp


Fig. 4.32. Removal of a nave of the synchronizer I and II of transfers


Fig. 4.33. Removal of a conducted gear wheel of the I transfer


Fig. 4.34. Removal of the needle bearing


Remove roller bearings from a secondary shaft. Remove an internal ring and basic half rings from a gear wheel of the V transfer (fig. 4.24). Press a gear wheel of the V transfer, previously having removed a remote ring (fig. 4.25).
Remove the gear wheel of the IV transfer blocking the plug (fig. 4.26) and take a clamp ball from a secondary shaft (fig. 4.27). Press a nave of the synchronizer III and IV of transfers. Remove a gear wheel of the III transfer (fig. 4.28), blocking plug fig. 4.29), a gear wheel of the II transfer (fig. 4.30) and take a clamp ball (fig. 4.31). Press a nave of the synchronizer I and II of transfers (fig. 4.32). Remove blocking ring of the synchronizer I of the transfer, a conducted gear wheel (fig. 4.33) and the needle bearing (fig. 4.34).

«previous page
6.2.5. Assembly of primary shaft
following page»
6.2.7. Assembly secondary валаф