Check of adjustment of TNVD. Nissan Almera (from 1995 to 1999 of release)
Nissan Almera service from 1995 to 2000 in N15 body
1. General information
2. The general requirements to car repairs
3. Operation and car maintenance
4. Petrol engines
5. Diesel engines
5.1. General information
5.2. Block of cylinders and krivoshipnoshatunny mechanism
5.3. Gazoraspredeleniye mechanism
5.4. Cooling system
5.5. Greasing system
5.6. Power supply system
5.6.1. Design features
5.6.2. Removal and TNVD installation
5.6.3. TNVD adjustment
5.6.4. Check of adjustment of TNVD
5.6.5. Adjustment of idling of the CD20 engine
5.6.6. Adjustment of the maximum frequency of rotation without CD20 engine loading
5.6.7. Adjustment of the shock-absorber of a drive of management by supply of fuel
5.6.8. Replacement of a belt of a drive of TNVD
5.6.9. Air and sediment removal from the fuel filter and system of supply of fuel
5.7. Control system of the CD20 engine
5.8. Control system of the CD20E engine
5.9. System of production of the fulfilled gases
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Electric equipment schemes
 







993f9bf4 993f9bf4 993f9bf4

5-6-4-proverka-regulirovki-tnvd.html

5.6.4. Check of adjustment of TNVD

Put a cranked shaft in a point of an initial corner of an advancing of injection of fuel. For this purpose turn a cranked shaft and establish cut (without color marking) its pulley against a label on the block of cylinders (the piston in the 1st cylinder is in the provision VMT of a step of compression). Turn a cranked shaft on 20 — 25 ° (for the CD20 engine) or on 100 ° (for the CD20E engine) counter-clockwise, then establish on «0» shooter of the indicator. Slowly turning a cranked shaft clockwise, establish a label of yellow color on a pulley of a cranked shaft against a label corresponding to an initial corner of an advancing of injection of fuel. In this position of the shooter of the indicator should show the set course of a plunzher of the pump. If the course of a plunzher of the pump deviates a preset value, repeat TNVD adjustment. Remove the adaptation from a support. Establish a stopper with new laying on the pump distributor. On CD20 engines remove a plate for device shutdown for start-up of the cold engine. Connect all sockets, vacuum drives and the cables suitable to TNVD. Establish топливопроводы a high pressure, then connect bringing and drain топливопроводы to the pump, connect the storage battery. Remove air from an engine power supply system with fuel.

«previous page
5.6.3. TNVD adjustment
following page»
5.6.5. Adjustment of idling of the CD20 engine