Installation of the power unit. Nissan Almera (from 1995 to 1999 of release)
Nissan Almera service from 1995 to 2000 in N15 body
1. General information
2. The general requirements to car repairs
3. Operation and car maintenance
4. Petrol engines
4.1. Removal and installation of the power unit
4.1.1. Removal of the power unit
4.1.2. Installation of the power unit
4.1.3. Removal, a detachment and installation of the power unit on cars with an automatic transmission
4.2. Dismantling and engine assembly
4.3. Block of cylinders
4.4. Shatunno-porshnevaya group
4.5. Cranked shaft and flywheel
4.6. Gazoraspredeleniye mechanism
4.7. Head of the block of cylinders of GA14DE and GA16DE engines
4.8. Head of the block of cylinders of the SR20DE engine
4.9. Cooling system
4.10. Greasing system
4.11. System of production of the fulfilled gases
4.12. Power supply system
4.13. Complex control system of the engine (KSUD)
5. Diesel engines
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Electric equipment schemes
 







993f9bf4 993f9bf4 993f9bf4

4-1-2-ustanovka-silovogo-agregata.html

4.1.2. Installation of the power unit

Preparation for installation. Before transmission installation with the engine put a layer of konsistentny greasing on a shlitsa of primary shaft of a transmission. Be convinced of the correct installation of pins on the engine or a transmission and that the bearing supporting primary shaft of a transmission, is in a flywheel groove. Center by means of a special opravka the provision of a conducted disk of coupling. Carefully pull a transmission over the engine before entry of adjusting pins into the nests. Establish the bolts connecting a case of a transmission to the engine; be convinced of the correct provision of all arms and tighten bolts the set moment. Establish a starter and tighten fastening bolts.
For installation of the power unit place it under the car and застропите for elevating eyes. Together with the assistant get the power unit the elevating device in a motor compartment. Check, whether stir installation auxiliary units, pipelines and electric wires.
Installation of the power unit is carried out in sequence, return to removal, taking into account the following instructions.
Be convinced of that electric wires are correctly laid and fixed by brackets, and electrosockets correctly and are reliably connected.
Before installation of shaft of a drive of forward wheels replace cuffs on flanges of semi-axial gear wheels of differential.
Check correctness of connection of branch pipes of system of cooling and their reliable fastening by collars.
Adjust a cable of a drive of management of a butterfly valve.
Replace new all самоконтрящиеся nuts.
Tighten carving connections by the set moment.
Replace lock rings on shafts of shaft of a drive of wheels.
Establish distance of 55 mm between two bolts of a rezinometallichesky support of a forward arm of a suspension bracket of the power unit before start an inhaling of fastening of arms of a suspension bracket.
Connect and adjust a coupling cable.
Establish and adjust auxiliary driving belts.
Fill in oil of demanded brand in the engine and a transmission.
Fill system of cooling with antifreeze and remove from it air.
Start up the engine and check absence of leakages of liquids.
After assembly check and if necessary adjust corners of installation of forward wheels.