Removal and installation of a protective casing of the evaporator. Nissan Almera (from 1995 to 1999 of release)
Nissan Almera service from 1995 to 2000 in N15 body
1. General information
2. The general requirements to car repairs
3. Operation and car maintenance
4. Petrol engines
5. Diesel engines
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
11.1. Main data
11.2. Body repair
11.3. Heating and ventilation system
11.4. Climatic installation (conditioner)
11.4.1. Filling of climatic installation
11.4.2. Removal and compressor installation
11.4.3. Removal and installation of a belt of a drive of the compressor
11.4.4. Removal and installation of a protective casing of the evaporator
11.5. System of safety cushions and prednatyazhitel of seat belts
12. Appendices
13. Electric equipment schemes
 









993f9bf4 993f9bf4 993f9bf4

11-4-4-snyatie-i-ustanovka-zashhitnogo-kozhukha-isparitelya.html

11.4.4. Removal and installation of a protective casing of the evaporator

Remove the dashboard. Remove a heater. Pump out a coolant from central air. Separate the socket of the sensor of pressure on the evaporator. Unscrew at level of a guard of a front in a motor compartment unions of pipelines of a contour of the conditioner. Remove fastenings of a protective casing of the evaporator to a guard of a front and to the fan. Separate halves of a protective casing of the evaporator, thus try not to damage the evaporator. Take out the evaporator.
Installation carry out in sequence, return to removal. Thus replace all sealing rings and a dehumidifier. Replace oil in a compressor case. Fill with a coolant a cooling contour. Check level of cooling liquid. Be convinced of absence of leakage of a coolant and operability of the conditioner.

«previous page
11.4.3. Removal and installation of a belt of a drive of the compressor
following page»
11.5. System of safety cushions and prednatyazhitel of seat belts