Removal and installation of a belt of a drive of the compressor. Nissan Almera (from 1995 to 1999 of release)
Nissan Almera service from 1995 to 2000 in N15 body
1. General information
2. The general requirements to car repairs
3. Operation and car maintenance
4. Petrol engines
5. Diesel engines
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
11.1. Main data
11.2. Body repair
11.3. Heating and ventilation system
11.4. Climatic installation (conditioner)
11.4.1. Filling of climatic installation
11.4.2. Removal and compressor installation
11.4.3. Removal and installation of a belt of a drive of the compressor
11.4.4. Removal and installation of a protective casing of the evaporator
11.5. System of safety cushions and prednatyazhitel of seat belts
12. Appendices
13. Electric equipment schemes
 









993f9bf4 993f9bf4 993f9bf4

11-4-3-snyatie-i-ustanovka-remnya-privoda-kompressora.html

11.4.3. Removal and installation of a belt of a drive of the compressor


Fig. 9.49. Belts of a drive of auxiliaries and adjustment of a tension of a belt of a drive of the compressor of the conditioner:
And — the petrol GA14DE engine and the diesel CD20 engine; B — the petrol GA16DE engine; 1 — a pulley of a cranked shaft; 2 — a pulley of the pump of the hydraulic booster of a steering;
3 — a pulley of the water pump; 4 — a generator pulley; 5 — a compressor pulley; 6 — a tension roller;
7 — a nut of fastening of a tension roller; 8 — the screw for adjustment of a tension of a belt



At work be guided fig. 9.49.
On cars with the GA16DE engine for removal of a belt of a drive of the compressor it is necessary to remove a belt of a drive of the water pump.
On cars with the GA14DE and CD20 engine remove the bottom protective guard on the right side of the engine. Weaken a tension of a driving belt of the compressor, having unscrewed a nut of a tension roller, then the bottom adjusting screw. Remove a driving belt.
Installation make as it should be, the return to removal. Thus pay attention to the following:
— whether the belt in pulley streams is correctly established;
— whether auxiliaries belts are correctly located;
— whether all belts are correctly tense;
— whether the nut of a tension roller is tightened.

«previous page
11.4.2. Removal and compressor installation
following page»
11.4.4. Removal and installation of a protective casing of the evaporator